PMU-based Angle Constraint Active Management on 33KV Distribution Network

22nd International Conference and Exhibition on Electricity Distribution (CIRED 2013)(2013)

引用 3|浏览18
暂无评分
摘要
Active Network Management (ANM) is an effective approach to release more distribution network capacity for connecting renewable generation without expensive network reinforcements. A pilot project is being carried out by ScottishPower Energy Networks in collaboration with Psymetrix new ANM approach on the 33kV distribution network on Isle of Anglesey, North Wales. The new approach is known as Angle Constraint Active Management (ACAM), where a renewable generation is constrained based on voltage angle difference signals produced by Phasor Measurement Units, and a set of angle constraints derived through offline network simulations. ACAM requires fewer measuring devices and simpler control logic than existing ANM solutions, and in this case, 19 potential constraints are managed by 4 angle difference measurements. The paper describes the concept of ACAM, and the progress of the pilot project, including hardware installation and communication set-up. The results of angle constraints threshold studies using the network model for controlling future wind capacity addition at selected locations are presented. Based on the results, the benefits of ACAM and potential challenges of implementing PMU-based applications in distribution systems are outlined.
更多
查看译文
关键词
distributed power generation,distribution networks,phasor measurement,ACAM,ANM approach,Isle of Anglesey,North Wales,PMU-based angle constraint active management,Psymetrix,ScottishPower energy networks,active network management,angle constraint active management,communication set-up,distribution network capacity,hardware installation,phasor measurement units,pilot project,renewable generation,voltage 33 kV,voltage angle difference signals,wind capacity
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要