Preliminary experience of a PDCA-cycle and quality management based training curriculum for rat liver transplantation.
Journal of Surgical Research(2012)
摘要
As repeatedly operating rat liver transplantation (LTx) until animals survive is inefficient in respect to time and use of living animals, we developed a new training concept. METHODS AND CONCEPTS: Training was divided into four phases: pretraining-phase, basic-microsurgical-training phase, advanced-microsurgical-training phases, and expert-microsurgical-training phase. Two "productivity-phases" were introduced right after the basic- and advanced-microsurgical-training phases, respectively, to allow the trainee to accumulate experience and to be scientifically productive before proceeding to a more complex procedure. PDCA cycles and quality criteria were employed to control the learning-process and the surgical quality. Predefined quality criteria included survival rate, intraoperative, postoperative, and histologic parameters.Three trainees participated in the LTx training and achieved their first survival record within 4-10 operations. All of them completely mastered the LTx in fewer procedures (31, 60 and 26 procedures) as reported elsewhere, and the more complex arterialized or partial LTx were mastered by trainee A and B in additional 9 and 13 procedures, respectively. Fast progress was possible due to a high number of training in the 2 Productivity-phases.The stepwise and PDCA-based training program increased the efficiency of LTx training, whereas the constant application and development of predefined quality criteria guaranteed the quality of microsurgery.
更多查看译文
关键词
criteria,liver transplantation,microsurgical training,PDCA-cycles,quality
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要