谷歌浏览器插件
订阅小程序
在清言上使用

An Integer Programming Approach to the Multimode Resource-Constrained Multiproject Scheduling Problem

Journal of scheduling(2015)

引用 34|浏览7
暂无评分
摘要
The project scheduling problem (PSP) is the subject of several studies in computer science, mathematics, and operations research because of the hardness of solving it and its practical importance. This work tackles an extended version of the problem known as the multimode resource-constrained multiproject scheduling problem. A solution to this problem consists of a schedule of jobs from various projects, so that the job allocations do not exceed the stipulated limits of renewable and nonrenewable resources. To accomplish this, a set of execution modes for the jobs must be chosen, as the jobs' duration and amount of needed resources vary depending on the mode selected. Finally, the schedule must also consider precedence constraints between jobs. This work proposes heuristic methods based on integer programming to solve the PSP considered in the Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA) 2013 Challenge. The developed solver was ranked third in the competition, being able to find feasible and competitive solutions for all instances and improving best known solutions for some problems.
更多
查看译文
关键词
Multimode resource-constrained multiproject scheduling problem,Integer programming,Matheuristics,MISTA Challenge
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要