The triangle scheduling problem

Journal of Scheduling(2017)

引用 11|浏览352
暂无评分
摘要
This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio . It is shown that the Greedy algorithm solves the problem to optimality when the binary tree ratio of the input instance is at most 2. We also show that the problem is unary NP-hard for instances with binary tree ratio strictly larger than 2 and provide a quasi-polynomial time approximation scheme. The approximation ratio of Greedy on general instances is shown to be between 1.5 and 1.05.
更多
查看译文
关键词
Scheduling,Mixed-criticality,Packing
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要