Back analysis of long-term stability of a 92 m span ancient quarrying cavern

Journal of Rock Mechanics and Geotechnical Engineering(2017)

引用 4|浏览12
暂无评分
摘要
Long-term stability of large-span caverns is a challenging issue for design and construction of underground rock engineering. The Heidong cavern group consisting of 21 caverns was constructed about 1400 years ago for quarrying in massive Cretaceous tuff. The cavern No. 5 of the Heidong cavern group is characterized by an unsupported span up to 92 m, with the overburden thickness of only 3–25 m. To analyze its long-term stability, a detailed investigation was conducted to obtain its geometry and rock mass characteristics, and to monitor surrounding rock displacements. Based on field survey and laboratory tests, numerical simulations were performed using the finite difference code FLAC3D. The analysis results revealed that for the long-term stability of the cavern No. 5, some major factors should be carefully considered, such as cavern excavation method in hard massive rocks, site investigation using trial pits, tools like short iron chisel and hammer for manual excavation, geometric dome roof, and waste rocks within abutment or on the floor. The highlights of the technologies obtained from this large-scale ancient underground project can provide reference for other similar project excavations in practice.
更多
查看译文
关键词
Cretaceous tuff,Heidong quarry,Largest span,Long-term stability,Manual excavation
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要