Salp Swarm Algorithm Based On Blocks On Critical Path For Reentrant Job Shop Scheduling Problems
INTELLIGENT COMPUTING THEORIES AND APPLICATION, PT I(2018)
摘要
In this paper, salp swarm algorithm based on blocks on critical path (SSA_BCP) is presented to minimize the makespan for reentrant job shop scheduling problem (RJSSP), which is a typical NP-complete combinational optimization problem. Firstly, the mathematical model of RJSSP based on the disjunctive graph is established. Secondly, the extended reentrant-smallest-order-value (RSOV) encoding rule is designed to transform SSA's individuals from real vectors to job permutations so that SSA can be used to perform global search for finding high-quality solutions or regions in the solution space. Thirdly, four kinds of neighborhood structures are defined after defining the insert operation based on block structure, which can be used to avoid search in the invalid regions. Then, a high-efficient local search integrating multiple neighborhoods is proposed to execute a thorough search from the promising regions found by the global search. Simulation results and comparisons show the effectiveness of the proposed algorithm.
更多查看译文
关键词
Reentrant job shop scheduling problem, Makespan, Salp swarm algorithm, Block structure
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要