A Min-Max Solution To Optimise Planned Lead Time In A Remanufacturing System

INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH(2019)

引用 11|浏览6
暂无评分
摘要
Determining a rational planned lead time (PLT) is a critical and difficult problem in production planning, especially for a remanufacturing system. This paper considers an optimisation problem of the PLT in a make-to-order remanufacturing system to coordinate disassembly-remanufacturing-reassembly and to improve performance. This optimisation model is designed to determine the PLT that minimises the inventory holding and shortage costs. Given the unknown distribution of remanufacturing time but with known first and second moments, this model is solved by a min-max approach, which can capture distributions with the same first and second moments. How the PLT and total cost are affected by yield rate with different first and second moments, unit holding cost, unit shortage cost and purchasing lead time are also investigated through numerical examples in this paper. The results of this study are shown to be consistent with practice and can be a support to decision-making in production planning and scheduling for remanufacturing.
更多
查看译文
关键词
planned lead time, remanufacturing, make-to-order production, partial distribution, optimisation
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要