Two-Stage Flowshop Scheduling with Outsourcing Allowed
International Journal of u- and e- Service, Science and Technology(2016)
摘要
In this paper we study the production-scheduling problem for a two-stage flow shop with outsourcing options. The maintenance of in-house machine and job-related discount for outsourcing cost are considered in model, in which total cost and makespan are regarded as bi-objective for the scheduling problem. Based on the analysis of model, we introduce a concept-packaging to reduce the complexity of problem and then develop heuristic algorithm to solve the problem. Computational experiments using different groups of data are conducted to test the algorithm.
更多查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要