谷歌浏览器插件
订阅小程序
在清言上使用

The Dual-Channel Balise Transmission System for Chinese Existing Railway

2016 International Conference on Progress in Informatics and Computing (PIC)(2016)

引用 0|浏览0
暂无评分
摘要
Chinese existing railway upgrading plan was proposed that the ground Balise could provide the data to the Train Control Record Device (TCRD). Because of the huge data requirement for the TCRD, the Balise data capacity should be expanded. Five technical proposals were mentioned and compared with each other. And the Dual-channel proposal, which consists of the Frequency-Shift Keying (FSK) channel and the Phase-Shift-Keying (PSK) channel, was considered as the better one preliminarily. Channel simulations were operated including frequency spectrum, bit error rate and spurious interference. Experiments were carried out in lab. Test results agreed well with the simulation analyses indicating the Dual-channel proposal is reasonable and feasible for Chinese existing railway upgrading.
更多
查看译文
关键词
Balise,Dual-channel,Chinese existing railway,TCRD
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要