Renewable energy sources (RESs) are actively connected with the grid, and thus the requirement for transmission network expansion planning has increased. When RESs are added to the grid as independent power plants under a deregulated power system structure, an independent system operator managing the transmission system should evaluate the impact of RES penetration. The system operator should restrict the capacity of the RES to be installed or perform transmission network expansion planning if necessary. This study proposes risk assessment (RA) based on an exponential risk level (RL) model to evaluate the negative effects of RES penetration and introduces a method of applying RA in scenario-based transmission network expansion planning. The index of RL reduction via a scenario is formulated as an economic efficiency indicator for reducing the RL, based on the result of RA. A case study is performed on an actual power system in South Korea. For two cases based on the penetration of RESs, transmission network expansion planning considering the proposed RA is performed for several scenarios, and then, the best scenario for each case is selected.
更多
查看译文
关键词
power transmission planning,risk management,renewable energy sources,power transmission economics,transmission network expansion planning,risk level assessment,scenario-based risk level improvement,renewable energy sources,independent power plants,deregulated power system structure,independent system operator,RES penetration,exponential risk level model,RL,RA,economic efficiency indicator,South Korea
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要