谷歌浏览器插件
订阅小程序
在清言上使用

Pmu Applications Prioritization Methodology Using Wide-Area Disturbances Events And Its Implementation In The Colombian Electric Power System

Leydi Zora,David Elizondo, Santiago Mesa Jaramillo, Jorge Enrique Gomez Castro, Ramón A. León,Jaime De La Ree

2017 IEEE POWER & ENERGY SOCIETY GENERAL MEETING(2017)

引用 1|浏览3
暂无评分
摘要
Phasor Measurement Units (PMUs) are devices that can not only measure but also time stamp voltage, current, frequency, among electric power system parameters. PMUs take these synchronized measurements as fast as 60 times per second and compared with the traditional 2-4 second SCADA measurements, PMUs bring a much clear and real-time picture of what is happening in the power system. PMUs have been increasingly deployed across transmission power grids worldwide. In the USA this has been primarily done by utilities through projects sponsored mainly by US Department of Energy Smart Grid grants. There are different applications that synchrophasors can provide, including off-line and real-time applications. Him ever, due to budget constraints, technology development and characteristics specific to each electric power system, not all applications are equally suitable for each system. This paper provides a methodology for PMU applications prioritization based on the analysis and results of wide area disturbance events as well as other factors that are described in detailed.
更多
查看译文
关键词
PMUs, disturbance analysis, synchrophasors, prioritization methodology
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要