A 12 Megawatt Power Plant with Fully Implemented Ancillary Services According to the German Grid Codes – The First Results

J. Godbersen, F. Mecking,J. Dannehl,S.B. Kjær

world conference on photovoltaic energy conversion(2011)

引用 0|浏览0
暂无评分
摘要
Since April 2011 all photovoltaic power plants connected in parallel with the German medium voltage network must comply with the TR3, TR4 and TR8 technical guidelines published by the Fordergesellschaft Windenergie FGW (Federation of German Windpower and other Renewable Energies). This includes requirements to activeand reactive-power, power quality, connection and disconnection of the plant to/from the network, immunity to faults on the network and requirements for certified simulation models. This paper gives a brief description about the implementation of the required functions (ancillary services) and shows some of the first obtained detailed results from a 12 MV photovoltaic power plant located in Busenwurth, northern Germany, equipped with approximate 720 string-inverters.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要