IMPROVING THE RESPONSE TIME FOR THE CORRECTIVE MAINTENANCE OF RAIL INFRASTRUCTURE: A CASE STUDY OF THE WESTERN CAPE PASSENGER RAIL NETWORK

SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING(2019)

引用 1|浏览0
暂无评分
摘要
Response time for repairing rail infrastructure failures remains a challenge in the South African rail industry. The 'mean time to return' metric consists of mean time to respond and mean time to repair. This article investigates the mean time to respond for signalling infrastructure at the Passenger Rail Agency of South Africa (PRASA) in the Western Cape, and introduces a strategy to reduce downtime. The results show that the time of occurrence, the location, and the nature of incidents, as well as the location of maintenance personnel, influence the time to respond. A model is developed to assist with improved decision-making.
更多
查看译文
关键词
response time,corrective maintenance,rail
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要