谷歌浏览器插件
订阅小程序
在清言上使用

BRIF: From the first proton beam to RIB production

Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms(2020)

引用 2|浏览93
暂无评分
摘要
Various technologies for high current compact H– cyclotron have been developed since 1990s [1,2]. The energy of compact style machines was firstly elevated up to 100 MeV [3,4] for Radioactive Ion Beam production. The project, BRIF, Beijing Radioactive Ion-beam Facility was approved to start the construction in 2011, and the first proton beam was extracted from the 100 MeV compact cyclotron CYCIAE-100 on July 4, 2014. This paper will present the progress on the BRIF after the first proton beam, including the cyclotron improvements for the stable operation and beam intensity increasing, the RIB production and the implementation for mass resolution of 24,460, and the future development etc.
更多
查看译文
关键词
Proton beam,Compact cyclotron,Stable operation,Radioactive ion beam,Mass resolution
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要