Maintenance scheduling in a railway corricdor

arxiv(2019)

引用 0|浏览19
暂无评分
摘要
We investigate a novel scheduling problem which is motivated by an application in the Australian railway industry. Given a set of maintenance jobs and a set of train paths over a railway corridor with bidirectional traffic, we seek a schedule of jobs such that a minimum number of train paths are cancelled due to conflict with the job schedule. We show that the problem is NP-complete in general. In a special case of the problem when every job under any schedule just affects one train path, and the speed of trains is bounded from above and below, we show that the problem can be solved in polynomial time. Moreover, in another special case of the problem where the traffic is unidirectional, we show that the problem can be solved in time $O(n^4)$.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要