An integrated system for scheduling of processing and assembly operations with fuzzy operation time and fuzzy delivery time

M.S. Yang,L. Ba, H.Y. Zheng,Y. Liu,X.F. Wang, J.Z. He,Y. Li

ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT(2019)

引用 6|浏览34
暂无评分
摘要
This paper integrates the processing scheduling with assembly scheduling, aiming to satisfy the requirements for just-in-time (JIT) production. Considering the uncertainty of time factors in actual production, the operation time of the jobs were represented as triangular fuzzy numbers and the delivery time of the final product as trapezoidal fuzzy numbers. An extended job-shop scheduling problem (JSP) considering above factors was proposed in this paper. A mathematical model was established for processing and assembly scheduling, aiming to achieve the mean satisfaction degree on delivery time. In light of the complexity of the problem, a genetic algorithm (GA) was designed to realize the fuzzy integrated optimization of processing and assembly under uncertainty. The proposed algorithm includes selection, crossover, mutation operations, and reflects the spirits of two-section real number encoding and elite protection strategy. Each part of the GA was designed in detail. Finally, the proposed model and algorithm were verified through a case study on processing and assembly scheduling. The model enjoys high practical value by taking the customer satisfaction of the delivery period as the main goal. The results show that our scheduling strategy mirrors the actual production situation and provides a good reference for JSP scheduling under multiple uncertainties. The best solution obtained by our model is more feasible than basic JSP in real production environment. (C) 2019 CPE, University of Maribor. All rights reserved.
更多
查看译文
关键词
Integrated scheduling,Uncertainty,Fuzzy operation time,Fuzzy delivery time,Genetic algorithm (GA)
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要