谷歌浏览器插件
订阅小程序
在清言上使用

Construction duration predictive model based on factorial analysis and fuzzy logic

Ambiente Construído(2019)

引用 1|浏览5
暂无评分
摘要
Abstract Setting the building construction duration for vertical residential works is made still in the study phase of economic and financial feasibility of the project and, in most cases, in an empirical way, increasing the uncertainties and the risks to fulfill the set deadline. However, there are computational intelligence tools that can contribute to reduce the degree of uncertainty. This study aimed to investigate the use of a hybrid system to estimate the deadline for vertical residential building works from design and production characteristics using factorial analysis and Fuzzy Systems. To this end, we used information of a database from the SEURB and in some buildings construction companies in Belém, a city located in the State of Pará, northern of Brazil. For the training and construction of the Fuzzy Forecast Model, data from 71 projects were used and 16 others residential buildings were used for its validation. The results showed a significant level of assertiveness, with 75% accuracy considering a range, whose upper and lower limits were calculated from MAPE and MASE. The model presented a prediction performance superior to other models already consecrated in the literature.
更多
查看译文
关键词
construction,fuzzy logic,duration,factorial analysis,predictive model
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要