Scheduling Lower Bounds via AND Subset Sum

ICALP(2020)

引用 8|浏览100
暂无评分
摘要
Given $N$ instances $(X_1,t_1),\ldots,(X_N,t_N)$ of Subset Sum, the AND Subset Sum problem asks to determine whether all of these instances are yes-instances; that is, whether each set of integers $X_i$ has a subset that sums up to the target integer $t_i$. We prove that this problem cannot be solved in $\tilde{O}((N \cdot t_{max})^{1-\epsilon})$ time, for $t_{max}=\max_i t_i$ and any $\epsilon > 0$, assuming the $\forall \exists$ Strong Exponential Time Hypothesis ($\forall \exists$-SETH). We then use this result to exclude $\tilde{O}(n+P_{max} \cdot n^{1-\epsilon})$-time algorithms for several scheduling problems on $n$ jobs with maximum processing time $P_{max}$, based on $\forall \exists$-SETH. These include classical problems such as $1||\sum w_jU_j$, the problem of minimizing the total weight of tardy jobs on a single machine, and $P_2||\sum U_j$, the problem of minimizing the number of tardy jobs on two identical parallel machines.
更多
查看译文
关键词
Scheduling,Single machine problems,Parallel machine problems,SETH,Subset sum,Lower bounds
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要