Assessing the Impact of Cost Overrun Causes in Transmission Lines Construction Projects
KSCE Journal of Civil Engineering, pp. 1029-1036, 2020.
Keywords:
Abstract:
Infrastructure projects are very essential in societies today because they enable the uninterrupted flow of goods, services, and information across any country. Although much research has been done to investigate cost overrun in different infrastructure projects such as transport, bridge, power plant, road, or even petroleum; little is kn...More
Code:
Data:
Upload PDF
1.Your uploaded documents will be check within 24h, and coins will be credited to your account.
2.As the current system does not support cash withdrawal, you can add staff WeChat (AMxiaomai) to receive it as a red packet.
3.10 coins will be exchanged for 1 yuan.
?
¥
Upload a single paper
for 5 coins
Wechat's Red Packet
?
¥
Upload 50 articles
for 250 coins
Wechat's Red Packet
?
¥
Upload 200 articles
for 1000 coins
Wechat's Red Packet
?
¥
Upload 500 articles
for 2500 coins
Wechat's Red Packet
?
¥
Upload 1000 articles
for 5000 coins
Wechat's Red Packet
Tags
Comments