A common approximation framework for early work, late work, and resource leveling problems
European Journal of Operational Research(2020)
摘要
•The early work maximization and the late work minimization problems in a parallel machine environment are considered.•Polynomial time approximation schemes are devised.•The results are extneded to resource leveling problems in a machine environment.•Some new ideas are proposed for designing approximation schemes.
更多查看译文
关键词
Scheduling,late work minimization,early work maximization,resource leveling,approximation algorithms
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要