谷歌浏览器插件
订阅小程序
在清言上使用

Effects of different types of imperfect advance demand information in production systems

Sara Fischer,Ben Benzaman, Elizabeth Diegel, Mario Soriano Gimenez,David Claudio

JOURNAL OF SIMULATION(2022)

引用 2|浏览3
暂无评分
摘要
One strategy to reduce inventories and increase on-time delivery is to use Advanced Demand Information (ADI) in which customers place their orders ahead of their due date. ADI can be divided into perfect or imperfect information. Under perfect ADI, customers send accurate demand information to the suppliers, specifying exact quantities and due dates. Under imperfect ADI, customer orders' quantities and/or due dates may change over time or order cancellations may occur. This research focuses on the effects of three types of imperfect ADI on different production systems: changing due dates, changing order quantities, and cancellations. Three different model variations simulate a pull system, a push system, and a hybrid system. We found that only cancellations and changing order quantities had a significant effect on system performance. Generally, the pull and the hybrid system behaved similarly and proved to be more suitable for managing imperfect ADI than the push system.
更多
查看译文
关键词
Imperfect advance demand information, variable due dates, variable order quantity, cancellations, production and inventory control systems, discrete event simulation
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要