Analysis of Changes of Forces and Normal Stress in Extradosed Tendons of the MS-3B Bridge Located on the Ring Road in Ostroda

Tadeusz Stefanowski, Piotr Supel,Wojciech Trochymiak

MATEC Web of Conferences(2018)

引用 0|浏览0
暂无评分
摘要
The article discusses the analyses of a numerical model of an extradosed bridge built as part of the project called "Construction of S7 expressway connecting Milomlyn and Olsztynek, together with construction of Ostroda Bypass as a section of national road no. 16." The constructed facility fits in with the global trends of construction of next generation concrete bridges with tensioned tendons. The bridge is the best in its class in Europe in terms of the length of its main span. It is also one of the first concrete bridges in Poland which have been built using cantilever technology in which the extradosed tendons were stressed during construction process. The article contains, in particular, the selected results of the analyses related to changes of forces and normal stresses in extradosed tendons depending on live loads to which the bridge was exposed during the service phases, while accounting for environmental and rheological as well as passage of time.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要