Chrome Extension
WeChat Mini Program
Use on ChatGLM

Unsteady Filling and Draining Cycles in Designing the Upper Chamber of the Surge Tank Limberg II

WASSERWIRTSCHAFT(2010)

Cited 0|Views0
No score
Abstract
The pump storage hydro power plant Limberg II of the hydro power scheme Glockner-Kaprun, Austria, will generate power using the difference in height between two reservoirs. A two-chamber surge tank will be built between the pressure tunnel and the pressure shaft. The design of this surge tank was checked by a hydraulic model test with a scale o 1:30. This article focuses on the unsteady filling and draining cycles which have to be considered in the design of the upper chamber of the surge tank.
More
Translated text
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined