Leveraging Constraint Scheduling: A Case Study to the Textile Industry

CPAIOR(2020)

引用 2|浏览3
暂无评分
摘要
Despite the significant progress made in scheduling in the past years, industrial problems with several hundred tasks remain intractable for some variants of the scheduling problems. We present techniques that can be used to leverage the power of constraint programming to solve an industrial problem with 800 non-preemptive tasks, 90 resources, and sequence-dependent setup times. Our method involves solving the traveling salesperson problem (TSP) as a simplification of the scheduling problem and using the simplified solution to guide the branching heuristics. We also explore large neighborhood search. Experiments conducted on a dataset provided by our partner from the textile industry show that we obtain non-optimal but satisfactory solutions.
更多
查看译文
关键词
Multi-resource,Scheduling,Constraint programming,Traveling salesman problem
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要