Injection and Dump Systems for a 13.5 TeV Hadron Synchrotron HE-LHC

Journal of Physics Conference Series(2018)

引用 2|浏览5
暂无评分
摘要
One option for a future circular collider at CERN is to build a 13.5 TeV hadron synchrotron, or High Energy LHC (HE-LHC) in the LHC tunnel. Injection and dump systems will have to be upgraded to cope with the higher beam rigidity and increased damage potential of the beam. The required modifications of the beam transfer hardware are highlighted in view of technology advancements in the field of kicker switch technology. An optimised straight section optics is shown.