Multi-Trip Pickup And Delivery Problem, With Split Loads, Profits And Multiple Time Windows To Model A Real Case Problem In The Construction Industry

PROCEEDINGS OF THE 10TH INTERNATIONAL CONFERENCE ON OPERATIONS RESEARCH AND ENTERPRISE SYSTEMS (ICORES)(2021)

引用 1|浏览0
暂无评分
摘要
This paper presents the first optimization study of multi-site transportation in the construction industry, which allows mutualizing building material delivery and construction waste removal. This study is inspired by a real-world problem encountered in the framework of the French R&D project DILC, in which a pooling platform must centralize the delivery of building materials to the construction sites and the pickup of their waste, using a limited and heterogeneous fleet that is allowed to perform multiple trips, under time and capacity limitation constraints. The problem under study, called the Multi-Trip Pickup and Delivery Problem, with Split loads, Profits and Multiple Time Windows is a new extension of the vehicle routing problem with pickup and delivery, that considers new realistic constraints specific to the construction industry such as each construction site may have a priority on its delivery request or its pickup request or both, with a higher priority level for delivery request, and each construction site may have several time windows. To solve this problem, we propose new insertion criteria that takes into consideration several aspects of our problem, which we have embedded in a construction heuristic. Experiments performed on new instances have shown the efficiency of our method.
更多
查看译文
关键词
Vehicle Routing Problem, Construction Industry, Pickup and Delivery, Split Loads, Profit, Multi-trips, Multiple Time Windows, Heuristic
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要