谷歌浏览器插件
订阅小程序
在清言上使用

Fuzzy mathematical models for maximizing satisfaction of contractors and clients by considering flexible start date of the project

Scientia Iranica(2022)

引用 0|浏览5
暂无评分
摘要
Resource-Constrained Multi-Project Scheduling Problem (RCMPSP) is considered a significant. topic in project management studies and many types of research have been carried out in this field in which numerous approaches have been proposed so far. However, in most of these approaches, the viewpoints of clients and contractors, i.e., two important stakeholders of the project, are not directly considered. The current research attempts to introduce a new approach, namely RCMPSP, to schedule the project portfolio and allocate the budget as a limited resource simultaneously. In doing so, first, clients and contractors' budget satisfaction is defined. Then, a number of budget allocation models have been proposed to maximize the satisfaction of clients and contractors. These models consider such constraints as minimum cost required for each project, maximum budget for each period, and flexibility of the start date of each project. To illustrate the viability of the proposed models, a real case of the project portfolio is considered. (C) 2022 Sharif University of Technology. All rights reserved.
更多
查看译文
关键词
Budget allocation,Satisfaction,Fuzzy linear programming,Project management,Resource-Constrained Multi-Project Scheduling Problem (RCMPSP)
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要