A Large Corporate Headquarter Retro-Commissioning: How Changes Produced Significant Energy Savings

Lixia Wu, Mingsheng Liu

ASHRAE TRANSACTIONS 2014, VOL 120, PT 1(2014)

引用 0|浏览1
暂无评分
摘要
The investigated facility is the world headquarter of a large corporation located in New Jersey. The facility is an 866,020 square feet (80,456 m(2)) campus with four commercial office buildings and a global network center building. The energy usage rate was high for this type of facility. A retro-commissioning project was approved in the fall of 2010. Energy conservation measures include adapting variable frequency drives on constant-speed fan and pump motors, changing control mode, optimizing fan and compressor control for air-handling units, conversion of constant-volume system to variable-volume system, re-commissioning and control optimization for the whole campus HVAC systems. Savings measurement and verification was performed from fall 2011 to fall 2012. As a result, over 4,510,110 kWh electricity and 3,718 MMBtu (1,090 MW) natural gas was saved annually. Comparing the weather normalized post-retrofit data against the pre-retrofit data, annual electricity consumption is reduced by 18% and gas usage is reduced by 6%. The total source energy savings is reduced by 17% after weather and billing period calibration. The overall payback was 2.4 years and reduced to 1.3 years with the rebate provided by NJCEP incentive program.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要