Predictability Of Well Construction Time With Multivariate Probabilistic Approach

PETROLEUM EXPLORATION AND DEVELOPMENT(2021)

引用 0|浏览4
暂无评分
摘要
Current univariate approach to predict the probability of well construction time has limited accuracy due to the fact that it ignores key factors affecting the time. In this study, we propose a multivariate probabilistic approach to predict the risks of well construction time. It takes advantage of an extended multi-dimensional Bernacchia-Pigolotti kernel density estimation technique and combines probability distributions by means of Monte-Carlo simulations to establish a depth-dependent probabilistic model. This method is applied to predict the durations of drilling phases of 192 wells, most of which are located in the AustraliaAsia region. Despite the challenge of gappy records, our model shows an excellent statistical agreement with the observed data. Our results suggested that the total time is longer than the trouble-free time by at least 4 days, and at most 12 days within the 10%-90% confidence interval. This model allows us to derive the likelihoods of duration for each phase at a certain depth and to generate inputs for training data-driven models, facilitating evaluation and prediction of the risks of an entire drilling operation.
更多
查看译文
关键词
well construction time, multivariate probabilistic modelling, probabilistic approach, Markov Chain Monte-Carlo
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要