谷歌浏览器插件
订阅小程序
在清言上使用

Fast-Track Completion Decision Through Ensemble-Based Machine Learning

Day 2 Wed, September 18, 2019(2019)

引用 4|浏览1
暂无评分
摘要
Abstract With the advent of high-resolution methods to predict hydraulic fracture geometry and subsequent production forecasting, characterization of productive shale volume and evaluating completion design economics through science-based forward modeling becomes possible. However, operationalizing a simulation-based workflow to optimize design to keep up with the field operation schedule remains the biggest challenge owing to the slow model-to-design turnaround cycle. The objective of this project is to apply the ensemble learning-based model concept to this issue and, for the purpose of completion design, we summarize the numerical-model-centric unconventional workflow as a process that ultimately models production from a well pad (of multiple horizontal laterals) as a function of completion design parameters. After the development and validation and analysis of the surrogate model is completed, the model can be used in the predictive mode to respond to the "what if" questions that are raised by the reservoir/completion management team.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要