The calculation method of optimized AC choppers capacity in islanded MMC-HVDC system

IOP Conference Series: Materials Science and Engineering(2020)

引用 0|浏览2
暂无评分
摘要
Abstract In order to ensure the safety of renewable energy generation integration system through islanded MMC-HVDC, the AC choppers with the same capacity as sending end converter station are equipped in current projects. However, considering the actual operation needs, it is not necessary to equip so many AC choppers. The optimal capacity of the AC choppers can be calculated according to the most serious fault. The calculated capacity can meet two requirements. One is the renewable energy generation units just start to cut off when the DC voltage reaches the overvoltage limit value. Another one is to minimize the cost and floor area of the AC choppers. It can ensure that the converter station devices is not be damaged in the condition of lowest economic cost. A three-terminal and a four-terminal renewable energy generation integration system through islanded MMC-HVDC are built in PSCAD, which verifies the correctness of the theoretical analysis.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要