Atikokan Digital Twin: Machine learning in a biomass energy system

APPLIED ENERGY(2022)

引用 12|浏览7
暂无评分
摘要
The Atikokan Generating Station, operated by Ontario Power Generation, has a 200 MW, biomass-fired tower boiler that operates on a dispatch schedule with a five-minute cycle. The boiler is generally operated in the range of 40-100 MW using two of five burner levels. In order to optimize boiler performance, we propose the implementation of a unique digital twin. Our digital twin abstraction couples Bayesian inference from science based models and from observations (machine learning) with decision theory to predict operating-variable set points that optimize the physical asset (the boiler) in the presence of uncertainty (artificial intelligence). We focus this paper on the continuous Bayesian machine learning part of the Atikokan Digital Twin; we discuss decision theory in a companion paper. We identify and learn about 12 operational, model, and measured-output parameters and their uncertainties from high-fidelity, science-based simulations of the Atikokan boiler and from the observed measurements at the power plant. Since the goal of the Atikokan Digital Twin is to implement it online in real time, we require fast function evaluations for the quantities of interest extracted from the simulations in the Bayesian analysis. We use Gaussian process regression/interpolation to create accurate, robust surrogate models. We define the Bayesian priors and likelihood function and solve for the posterior distributions of the 12 parameters. We then propagate these distributions (i.e., parameters with uncertainty) into the predicted distributions of 790 quantities of interest to learn about the relative importance of various sources of error including experimental, model, and operating-parameter errors.
更多
查看译文
关键词
Bayesian machine learning, Digital twin, Uncertainty quantification, Science-based models, Biomass boiler
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要