Scheduling optimization of silicon single crystal production process based on adaptive improved particle swarm optimization

2021 China Automation Congress (CAC)(2021)

引用 0|浏览1
暂无评分
摘要
Aiming at the potential safety hazards of silicon single crystal production enterprises in the process of multi-furnace silicon single crystal production, and considering the maximum power load requirements in actual enterprises, a silicon single crystal production process scheduling model with the goal of minimizing the maximum completion time was established. Based on this model, an adaptive improved particle swarm optimization algorithm (Adaptive GPSO) is proposed to solve it. The algorithm retains the individual optimal value and global optimal value of the particle swarm algorithm, and introduces the crossover operation and mutation operation in the genetic algorithm to improve the new individual generation mechanism. At the same time, it performs dynamic iterative calculations on the mutation probability and crossover probability to avoid the algorithm fall into the local optimum, and improve the diversity and convergence of the algorithm. By solving different scales scheduling problems of silicon single crystal production process, the experiments on real-world data shows that the feasibility and effectiveness of the proposed algorithm.
更多
查看译文
关键词
silicon single crystal production process scheduling,power load,minimize the maximum completion time,adaptive GPSO algorithm
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要