An MILP based optimization model for reservoir flood control operation considering spillway gate scheduling

Journal of Hydrology(2022)

引用 6|浏览8
暂无评分
摘要
•Reservoir flood control operation considering spillway gate scheduling is studied.•The influence of the reservoir water level and opening degree on the gates’ discharge capacity are considered.•An MILP based model is developed through several linearization strategies.•The proposed model can produce more executable flood control operation scheduling.
更多
查看译文
关键词
Flood control operation,Spillway gate scheduling,Gate operation rules,Water discharge curves,Mixed-integer linear programming
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要