Impact of modularization and site staffing on construction schedule of small and large water reactors
Nuclear Engineering and Design(2022)
摘要
•Methodology for estimating the construction duration of nuclear projects.•Construction schedules of 3 large and 3 small water reactors are estimated.•Smaller reactors are more insensitive to staffing constraints.•Smaller reactors are more sensitive to modularization assumptions.
更多查看译文
关键词
BWR,DOE,EEDB,GA,IDC,LWR,PWR,SMR
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要