Scheduling High Multiplicity Jobs on Parallel Multi-Purpose Machines with Setup Times and Machine Available Times

ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH(2022)

引用 1|浏览0
暂无评分
摘要
In this paper, we consider the scheduling of high multiplicity jobs on parallel multi-purpose machines with setup times and machine available times, with the objective of minimizing makespan. High multiplicity means that jobs are partitioned into several groups and in each group all jobs are identical. Whenever there is a switch from processing a job of one group to a job of another group, a setup time is needed. Multi-purpose machine implies that each job can only be processed by a specific subset of all the machines, called processing set. A mixed integer programming is formulated for this NP-hard problem. A heuristic is proposed to solve the problem. Lower bounds are developed to evaluate the heuristic algorithm. Extensive numerical computations are performed and the results show that the heuristic generates solutions with makespan within 2% above the lower bounds in average, and outperforms CPLEX 12.6 for large scale and complex problems.
更多
查看译文
关键词
Scheduling, multi-purpose machine, high multiplicity, makespan, heuristic
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要