Two-stage stochastic program for disassembly lot-sizing under random ordering lead time

IFAC-PapersOnLine(2022)

引用 0|浏览0
暂无评分
摘要
This study addresses disassembly lot-sizing that determines the ordering and disassembly schedules of end-of-life (EOL) products and subassemblies to satisfy items demands. A stochastic version with uncertain ordering lead time (OLT) is considered for the first time. Here, OLT represents the time elapsed between placing an order and receiving it (only an EOL product can be ordered). Stochastic integer programming model is developed for the objective of minimizing the expected sum of setup, purchase, inventory and backlog costs. To test the performance of the proposed model, computational experiments were done on various test instances and are reported. The results show that the performance of the proposed model depends on the size of the ordering lead times, the number of periods and components.
更多
查看译文
关键词
Disassembly lot-sizing,random ordering lead times,two-stage stochastic programming
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要