谷歌浏览器插件
订阅小程序
在清言上使用

Accelerating Mini-grid Feasibility Assessments with Rapid Engineering and Business Model Evaluation

IEEE Global Humanitarian Technology Conference (GHTC)(2022)

引用 0|浏览4
暂无评分
摘要
There are over 700 million people without access to electricity in the world today, most of which live in Sub-Saharan Africa. Due to the high cost of grid extension, off-grid mini-grids with renewable energy technologies have been considered to be a least cost option for providing electricity access for communities, with solar home systems common for isolated households. However, mini-grid feasibility assessments can be expensive, time consuming, and achieve limited accuracy with current planning tools and constraints. In this paper we develop new planning processes for off-grid mini-grid systems and demonstrate this approach for a mini-grid project for an off-grid community in Sierra Leone, with comparisons made to conventional planning steps. Results show a decrease in assessment time per site of over 75-80% when compared to conventional practices, and provide additional benefits including power engineering, costing of the distribution network, and more detailed cashflow and business model analysis.
更多
查看译文
关键词
Mini-grids,Energy access,Business model,Power Engineering
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要