Fault ride through constrained protection scheme for distribution networks with DFIG-based wind parks

Electric Power Systems Research(2023)

引用 1|浏览4
暂无评分
摘要
•Investigate the effect of protection scheme on the FRT requirements of DFIGs.•Preventing disconnection of DFIGs by integrating FRT into overcurrent protection.•Determine least number of communication links for relays to prevent FRT violation.•Independent of DG control, applicable to different control modes during fault.
更多
查看译文
关键词
Communication link,Coordination,Fault ride through (FRT),Overcurrent relay,Wind turbine
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要