Validation of the Power Plant Controller for Frequency Support Applications Using Hardware-in-the-Loop Testing

Mo'ath Farraj,Reza Salehi,Ahmad Momeni,Amin Zamani, Rohit Kadem

2022 IEEE Electrical Energy Storage Application and Technologies Conference (EESAT)(2022)

引用 1|浏览0
暂无评分
摘要
In recent years, the significant integration of inverter-based resources (IBRs) for grid support applications and ancillary services has increased system complexity and challenges. To address the challenges associated with the declining inertia of the system, the transmission system operators (TSO) have implemented obligatory frequency regulation anciIRllary services to be followed by customers. This paper presents the process of testing the compliance of a power plant controller (PPC) by the Electric Reliability Council of Texas (ERCOT) before deployment in the field. In particular, the functionality of primary frequency response (PFR) and fast frequency response (FFR) controllers of the PPC is demonstrated through hardware-in-the-loop (HIL) testing. The results show that tuned PPC controller with proper integration into the system can comply with ERCOT requirements.
更多
查看译文
关键词
Ancillary service,energy management system),fast frequency control,hardware-in-the-loop,power plant controller,primary frequency control
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要