Fabrication of the Fermilab Pre-Series Cold Mass for the HL-LHC Accelerator Upgrade Project

A. Vouris, R. Bossert, J. DiMarco,S. Feher,L. Martin, T. Strauss,C. Wilson, H. Prin,E. Todesco

IEEE Transactions on Applied Superconductivity(2023)

引用 1|浏览4
暂无评分
摘要
Fermilab is fabricating ten full length cold masses for the high-luminosity Large Hadron Collider Accelerator Upgrade Project (HL-LHC AUP). One practice assembly and one pre-series assembly have been completed. This paper summarizes the con-struction details. Topics include incoming inspection, bus assembly, component machining, shell forming, beam tube insertion, bus expansion loop installation, instrumentation installation, electrical testing, heat exchanger installation and final assembly welding. In-process surveys, alignment measurements and testing are presented and explained. Problems encountered during construction and their solutions are discussed.
更多
查看译文
关键词
Accelerator magnets,bus,cold mass,expansion loops,HL-LHC,LMQXFA,quadrupole
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要