Design of Temporary Beam Stops and Bunker Wall Plugs at ESS

Amalia Chambon, Luca Zanini

NUCLEAR SCIENCE AND ENGINEERING(2024)

引用 0|浏览2
暂无评分
摘要
The European Spallation Source (ESS) is currently under construction in Lund, Sweden. At the time of the first beam-on-target, foreseen in 2025, a first set of neutron scattering instruments will be commissioned, in addition to a test beamline for characterization of the source. For every planned beamline, all optics components will already have been installed in the monolith shielding surrounding the spallation target, but instruments will still be under construction in the neutron bunker area. Blocks of shielding, referred to as temporary beam stops or wall plugs, are then required to capture neutrons that will come out through the bunker wall feedthroughs during operation. This paper presents the results of parametric studies carried out to design temporary beam stops to assess the possibilities of reducing the weight and cost of such components and also to investigate the shielding efficiency of a wall plug as an alternative solution.
更多
查看译文
关键词
European Spallation Source,beam stop,shielding,MCNP
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要