Improved investment cost model and overhead cost consideration for high voltage direct current infrastructure

2023 19TH INTERNATIONAL CONFERENCE ON THE EUROPEAN ENERGY MARKET, EEM(2023)

引用 0|浏览1
暂无评分
摘要
The ongoing large-scale deployment of offshore wind parks creates the need for substantial investments in Voltage Source Converter (VSC) based High Voltage Direct Current (HVDC) transmission infrastructure. An investment cost model with a corresponding cost parameter set was established in 2018 to improve the accuracy of HVDC grid expansion planning. As part of an ongoing initiative to continue previous work, the cost model has been updated and expanded. UnderGround Cables (UGC) are now treated similarly to SubMarine Cables (SMC) for a more accurate inclusion of onshore extensions of offshore HVDC networks. The parameter fitting methodology, which identifies the cost model parameters, has also been updated to consider different overhead costs, which increases the precision of processing cost data from real HVDC projects for parameter fitting, and, therefore, the accuracy of the cost parameter set.
更多
查看译文
关键词
VSC,HVDC,CAPEX,Cost model,Transmission Expansion Planning
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要