谷歌浏览器插件
订阅小程序
在清言上使用

The "BOOT Plus BTO" Operation Mode of the Comprehensive Utilization of Water Conservancy Project

DESALINATION AND WATER TREATMENT(2023)

引用 0|浏览4
暂无评分
摘要
The coexistence of public welfare and business nature of comprehensive utilization of water conser-vancy projects has affected application of its PPP project model. This paper studies the mixed invest-ment characteristics and asset structure characteristics of the comprehensive utilization of water conservancy projects, and analyzes the problems of the BOT operation mode of the comprehensive utilization of water conservancy projects, such as high pressure of early operation and maintenance funds, vague risk definition and unequal risk responsibility. The operating facilities and non -operat-ing facilities of comprehensive utilization water conservancy projects are "appropriately separated", and the operating facilities adopt BOOT mode and the non-operating facilities adopt BTO mode. The "BOOT+BTO" bundled operation model of PPP project of comprehensive utilization water con-servancy project is constructed, and the feasibility and advantages of the "BOOT+BTO" operation mode of
更多
查看译文
关键词
Comprehensive utilization of water conservancy project,PPP project,BOT operation mode,"BOOT plus BTO" mode
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要