First to signal criterion for comparing control chart performance

QUALITY ENGINEERING(2024)

引用 0|浏览2
暂无评分
摘要
Control chart performance is often measured using average run length or median run length, which gives the expected or median number of samples to signal. It is often argued that on average, one chart will signal a process change quicker than another, and is therefore a better choice. Average and median run length do not, however, answer the question of which method will be more likely to signal first. We introduce the idea of "first to signal" and compare charts based on this criterion.
更多
查看译文
关键词
Average run length,CUSUM chart,EWMA chart,statistical process monitoring
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要