Optimal price-based scheduling of a pumped-storage hydropower plant considering environmental constraints

ENERGY SYSTEMS-OPTIMIZATION MODELING SIMULATION AND ECONOMIC ASPECTS(2023)

引用 0|浏览0
暂无评分
摘要
The paper proposes a novel medium-term scheduling model for a hydropower system composed by a pumped storage hydropower plant connected to a traditional hydropower plant subject to three types of environmental constraints; these deal with the maximum water abstraction from the reservoir thought the turbines and through the pump for energy production, the minimum environmental water flow and the ramping capabilities of water volumes inside the system’s reservoirs. The scheduling problem is formulated for a planning horizon of 1 year with weekly decision stages. The methodology to determine the optimal operation of the plant is based on a stochastic dynamic programming algorithm which allows for an accurate representation of the uncertainties associated to the water inflows and energy prices. Moreover, it facilitates the handling of the non-convex characteristic of the state-dependent constraint on maximum water abstraction from the reservoir. The model is applied to the case of a real hydropower system based on a cascaded watercourse with two conventional hydropower plants in south of Norway to assess the economic benefits of having a pumping unit and the technical impact of the above-mentioned environmental constraints. Furthermore, this work proposes a methodology to analyze the optimal operation of the hydropower system, computed for different temporal resolutions, in order to investigate the techno-economic impact of the constraints involving dependencies on the states of the system, the different environmental constraints and other seasonal effects on the accuracy and the applicability of medium-term scheduling models. Further case studies assess the computational burden and the precision of the results when adopting a finer discretization of the state variables of the dynamic-programming-based methodology.
更多
查看译文
关键词
Pumped storage hydropower plant,Optimal hydropower scheduling,Environmental constraints,Electricity markets,Stochastic dynamic programming
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要