Installation and Low Power Test of IFMIF-EVEDA RFQ at Rokkasho Site

E. Fagotti, David Agguiaro, L. Antoniazzi, Andrea Baldo, Alex Battistello, Luca Bellan, Fabio Borotto Dalla Vecchia, Paolo Bottin, Philippe Cara, Andrea Giorgio Colombo, M. Comunian, A. Conte, Giovanni Dughera, L. Ferrari, M. Furini, Cristiano Gessi, Dominique Gex, M. Giacchini, G. Giraudo,Francesco Grespan,R. Heidinger, Ryo Ichimiya, Y. Ikeda, Atsushi Kasugai, J. Knaster,Keitaro Kondo, Alvaro Marqueta, Paolo Mereu, Maurizio Montis, Shigeru O’hira,Antonio Palmieri, R. Panero, A. Pisent, Giuseppe Pruneri, K. Sakamoto, Francesco Scantamburlo, D. Scarpa,Takahiro Shinya,M. Sugimoto

8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, 14–19 May, 2017(2017)

引用 0|浏览0
暂无评分
摘要
The IFMIF-EVEDA RFQ is composed of 18 modules for a total length of 9.8 m and is designed to accelerate the 125 mA D⁺ beam up to 5 MeV at the frequency of 175 MHz. The RFQ is subdivided into three Super-Modules of six modules each. The Super-Modules were shipped to Rokkasho (Japan) at the beginning of 2016, pre-assembled 3 m far from the final location and tuned to reach target field flatness requirements. Just after conclusion of injector commissioning, the tuned RFQ was disassembled, moved and reassembled in the final location. After confirmation that field flatness was not affected by this movement, high power couplers were installed and tuned and all the structure was baked. Assembling, tuning and coupling results will be presented.
更多
查看译文
关键词
low power test,ifmif-eveda
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要