谷歌浏览器插件
订阅小程序
在清言上使用

Production of High Purity MoO3 from Spent Catalyst of Formaldehyde Synthesis Process Via a Novel Two-Step Leaching-Cementation Method

Sajjad Mohammadi,Ali Taheri Najafabadi, Hossein Aboody, Mohammad Reza Akhlaghi,Majid Saidi

Journal of Industrial and Engineering Chemistry(2024)

引用 0|浏览5
暂无评分
摘要
This study presents a two-step methodology for producing high-purity MoO3 from spent FORMOX process catalysts. In the first step, a leaching process with a Na2CO3 solution is used to get molybdenum out of formaldehyde synthesis catalyst. The second step involves molybdenum-ion cementation in the presence of metallic zinc powder and plates. The leaching process is thoroughly explored using the design of experiments (DOE) to analyze critical parameters such as temperature, leaching time, Na2CO3/Mo stoichiometric ratio, and catalyst average particle size. A robust quadratic model with an R2 value exceeding 97 % is developed, serving as a predictive tool for molybdenum extraction. Through rigorous numerical optimization, the optimal conditions for 100 % extraction were found to be 74.5 °C, 92.3 min, a stoichiometric ratio of 2.52, and a particle size of 183 μm. However, the use of zinc powder in the cementation stage introduces impurities due to increased solution pH and reduced zinc dissolution. The strategic adoption of zinc plates mitigates these challenges, resulting in a notable enhancement of the final product's purity. Over 91 % of MoO4-2 ions with a purity surpassing 99.8 % are successfully obtained as hexagonal MoO3 powder at 85 °C with an initial solution pH of 1.0 after 15 min of the cementation process.
更多
查看译文
关键词
Spent formaldehyde synthesis catalyst,FORMOX process,Alkaline leaching,Design of experiment (DOE),Zn cementation,MoO3 synthesis
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要