Over the last five years United Utilities has undertaken major capital investment to further reduce the risk from Cryptosporidium and trihalomethanes in more than half the supplies in the northwest of England. The majority of the supplies in the region come from upland surface sources which historically have had minimal treatment and in consequence high organic concentrations. The factors influencing the integration of new treatment processes with existing, the choice of process and the challenges arising are discussed, as is their impact on the water quality. In particular, the benefit to the two measures which are driving the investment. The consequences extend beyond that achieved at the water treatment works. The reduced organic input into the distribution network has resulted in chlorine persisting a lot further into the distribution system. As a result of this, and the lower organic input, bacteriological activity has fallen substantially with consequent reduction in the presence of coliform bacteria. The lower concentration of organics has contributed to a substantial reduction in lead concentrations. This has been clearly illustrated by lead concentrations observed at lead pipe rigs situated within the distribution network.
High Leys Service Reservoir (SR) was required as part of the West Cumbria Water Supplies Project (WCWSP) by United Utilities PLC to feed the south-western region of the network including Egremont, Whitehaven and local regions. The principal contractor was Mott MacDonald Bentley. The site was chosen for its strategic elevated position to reduce outgoing pumping and provide adequate pressure within the WCWSP network. With a footprint of 10 512 m2 (109.5 m × 96 m) and 50 ML storage capacity, the SR comprises a semi-precast concrete (PCC) system (precast/in situ composite). As of March 2021, High Leys SR stands as the largest semi-precast SR in Europe. Due to the size and complexity of the scheme, elements of the design and construction were constrained by the requirements of the Lake District National Park Steering Group. Enabling works commenced in June 2018 followed by SR construction through 2019, with planned completion late 2021. This paper details the phases of construction highlighting key design philosophies and construction techniques. Furthermore, the benefits of implementing a PCC system instead of a traditional in situ construction for a potable water-retaining structure are discussed. The paper identifies benefits associated with design, quality assurance, speed of construction, sustainability, safety and innovations.
The biomethanation of CO2 from anaerobic digestion within the power to gas concept has recently emerged as a promising technology to upgrade biogas, to decarbonise the domestic and industrial heat sector, provide long term energy storage and deliver grid balancing services. In addition, the utilisation of the digestate, through a process such as gasification, offers a circular economy approach and has the potential to enhance the deployment of power to gas systems. To this direction, the study focuses on exploring the techno-economic feasibility of coupling biomethanation with digestate gasification for the wastewater industry. The study constitutes the first endeavour to assess the viability of such an integrated energy system. Four different scenarios have been designed and assessed. The energy efficiency of the concepts lies between 26.5% and 35.5% while the minimum selling price (MSP) of biomethane is in the range of 135-183 pound/MWh. The implementation of appropriate policy mechanisms and the inclusion of by-products revenues reduces the MSPs by approximately 32%-42%. The conduction of a typical sensitivity analysis has identified the electricity price as the prime cost driver and this is followed by the cost of the electrolyser or the gasification plant depending on the scenario. Finally, a 2030 analysis, that incorporates projected techno-economic advances, has been carried out and revealed that under certain circumstances profits can be generated.
•We show percolation theory is lacking when used to analyse interdependent infrastructure failures.•A new method to analyse interdependent infrastructure systems is proposed.•It recognises the hierarchical natural of infrastructure systems.•We apply the analysis to two real-world infrastructure systems.