MWH Global Inc. is a global water and natural resources firm providing technical engineering, construction services and consulting services. In 2016, MWH was acquired by Stantec Consulting Inc. The firm provided planning, design and construction management for water and natural resources projects around the world. The firm was headquartered in Broomfield, a suburb of the Denver metropolitan area in the state of Colorado of the United States, with operations in 35 countries. As of May 2015, MWH Global had a global staff of approximately 7,000 employees including builders, engineers, architects, geologists, operators, project managers, business consultants, scientists, technologists, and regulatory experts. MWH is listed as the 15th-largest employee-owned company in the United States.
Options for increasing reservoir storage in developed regions are limited and prohibitively expensive. Projected increases in demand call for new long‐term water storage to help sustain agriculture, municipalities, industry, and ecological services. Managed aquifer recharge (MAR) is becoming an integral component of water resources around the world. However, MAR faces challenges, including infrastructure costs, difficulty in enhancing recharge, water quality issues, and lack of available water supplies. Here we examine, through simulation modeling of a hypothetical agricultural subbasin in the western U.S., the potential of agricultural managed aquifer recharge (Ag‐MAR) via canal seepage and off‐season field irrigation. Weather phenomenon in many regions around the world exhibit decadal and other multiyear cycles of extreme precipitation. An ongoing challenge is to develop approaches to store greater amounts of water during these events. Simulations presented herein incorporate Ag‐MAR programs and demonstrate that there is potential to enhance regional recharge by 7–13%, increase crop consumptive use by 9–12%, and increase natural vegetation consumption by 20–30%, where larger relative increases occur for lower aquifer hydraulic conductivity and higher specific yield values. Annual increases in groundwater levels were 7 m, and sustained levels following several years of drought were greater than 2 m. Results demonstrate that Ag‐MAR has great potential to enhance long‐term sustainability of water resources in agricultural basins.
Within many construction and engineering organizations, communities of practice (CoPs) have become an important means for managing knowledge. They are employed to connect employees with technical specialists, which should reduce repeated mistakes, improve technical practice, and generate thought leadership. While organizations often implement CoPs as a means for coordinating specialist knowledge, very little is known about how professionals actually locate and connect with one another, making it difficult for organizations to employ CoPs effectively. To better understand how professionals identify and connect with colleagues, this research first conducted social network analysis to identify existing connections within three intraorganizational CoPs comprised of 1,791 members in two organizations, and then conducted and analyzed 77 interviews about dyadic connections to determine how individuals within these CoPs connected. From this analysis, four mechanisms of connection were identified, including organizational control, organizational opportunity, social networks, and non-person-centered searching. These connection mechanisms include a hybrid of social and organizational structures, reinforcing the need to strategically create and manage CoPs in project-based organizations. More specifically, these conclusions suggest that managerial control within CoPs is still an important mechanism to facilitate knowledge-sharing connections within distributed CoPs. (C) 2017 American Society of Civil Engineers.
Groundwater-dependent ecosystems are particularly vulnerable to groundwater decline. The South East of South Australia has experienced considerable hydrological change due to drainage, clearance of native vegetation, irrigated agriculture, and forestry. Recent hardwood plantings in the Limestone Coast Prescribed Wells Area have increased considerably since 2000, coincident with groundwater decline; however, the introduction of hardwood plantations coincided with a period of lower than average rainfall. Given the economic implications of modifying water allocation policy based on apparent anthropogenic causes, establishing the contributions to the observed declines in groundwater level was necessary. The water balance shows a net gain in water across the entire Lower Limestone Coast Prescribed Wells Area, yet sites with forestry land use show the water table has been declining at a rate up to 0.7 m yr(-1) since 2004, whereas no long-term change has occurred in the water table depth at adjacent pasture sites. Forested areas have 4050 wetlands at risk with groundwater decline >0.3 m yr(-1), covering a total wetland area of of 212 km(2). A series of 15 policy scenarios were simulated using a groundwater flow model to examine how climate, land use, and particularly forestry would impact groundwater, with an imperative to enact policy to protect remaining wetlands. Water allocation policy accounted for groundwater extraction for irrigated agriculture, but other activities, such as forestry, were not considered in water allocation even though they were found to be a major water user. Following this study, the South Australian Government amended its Natural Resources Management act to stipulate that forestry must have a water licence and a water allocation to account for water used by the forest.
The purpose of this chapter, is to provide a Maintenance and Reliability Management Model for the project: Design and Construction of the Third Set of Locks in the Panama Canal, with the approach of the process of asset management optimization. A practical vision of the maintenance and reliability management process and framework is presented with the idea of: Structuring the maintenance management process by grouping management activities within a series of so-called management building blocks; Structuring the framework grouping techniques that can be used to support decisions to be taken within each of these building block. This chapter presents not only a process but also the framework and techniques to manage and improve maintenance and reliability effectiveness and efficiency. This report will be used to assist different plant teams to elaborate the optimal strategies for maintenance and inspection for the assets, specified for the project: Third Set of Locks in the Panama Canal.